Yen Vo
We are currently looking for a support vessel to hire for a project in Vietnam from the beginning of the year 2025, the details as follow:
Scope: vessel is utilized for flexible pipeline and subsea cable installation work;
Vessel requirement:
Deck: min 800-1000 m2;
Crane capacity: can lift 25t within 15-20m radius;
Min DP2 vessel.
Offshore duration: 25-30 days;