For sale: 19,500 DWT deck cargo ships; Forward driver Forward springboard.
Class: China ZC
Flag: China.
Construction time: August 2023.
Construction location: Jiangsu, China.
Full-load draft: 6.2 meters.
No-load draft: 4.723 meters.
Full-load displacement: 27,810.500 tons.
Empty displacement: 7,509.954 tons.
Total length: 150.30m/ Width: 36.8m/ Depth: 9.0m.
GRT: 12807T.
NRT: 7171T.
M/E:G8300ZC6B-1471KW/500rpm 2 units;
Manufacturer: Ningbo Diesel Engine, China.
Auxiliary machines: 400KW*2 units; 90KW*1 unit 100KW*1 unit 150KW*1 unit.
Main engine fuel oil: HFO180
Accessory fuel oil: MGO 20.
The next deadline is August 2026 / the next SS is August 2028.
Speed: 11 knots.