GRS identification number: #1076909
Vessel Type: MPSV(Multi-Purpose Support Vessel);
Flag: Saint Vincent And The Grenadines;
Classification Society: BV;
Navigation Area: Unrestricted navigation;
Class Notation: I ?HULL ?MACH
Diving support-capable Supply vessel Fire fighting ship 1 Oil recovery ship Special service Standby rescue vessel, 150 survivors in tropical area SP 105 -water spraying -oil product -chemical product
Unrestricted navigation
COMF-NOISE 3, COMF-VIB 3, ?AUT-UMS , CLEANSHIP SUPER 7+, ?ALM, ?DYNAPOS -
AM/AT -RS,SDS
LOA/MLB/MLD: 100.2m x 21.0m x 8.0m;
GRT/NRT: 6146/1843;
Deadweight Tonnage: 4630t;
Summer Draft: 6.35m;
Azimuth Propeller: 1686kW x 3 sets;
Main Generator: Cummins KTA 50DM1, 1291kW x 7 sets (Tier II);
Emergency Generator: 180kW x 1 set;
Bow Thruster: 843kW x 2 sets;
Retractable Thruster: 843kW x 1 set;
Fire Fighting: FiFi 1;
Dynamic Position: DP3;
Accommodation: 105 persons;
Crane: 1 x 150t, 1 x 40t;
Built Year/Shipyard: 2014/Zhejiang Shipbuilding Co., Ltd;
Deck Area: 940m2; Deck loading: 5~10t/m2;
F.O. Tank: 1124.42m3; F.W. Tank: 946.38m3;
B.W. Tank: 2540.7m3; Special Product Tank: 395.41m3;
Next Annual Survey: October 9, 2026;
Next SS Date: October 9, 2028;
Remark: The vessel has been operating well since its delivery and the latest operational record is from June 2024 till July 2026. She was employed by one top oil company in offshore Ivory Coast. She will return to, be berthed and delivered in Abidjan, Ivory Coast.
Starting Price / Reserve Price: US$35million; Bidding Deposit: If the bidders pay US dollar, the Bidding Deposit is 10% of the Starting Price. Each increment of the bidding price shall be in an integer multiple of US$20000.
LOA 100.2 m
Beam 21 m
Draft 6.35 m
Built in year 2014
Design is : GPA 696
Class : Bureau Veritas
Flag : Saint Vincent & The Grenadines
Gross Tonnage of 6,146 and Nett Tonnage of 1,843
Dynamic Positioning of class : DP 3
Free Deck area about 940m² with a deck strength of 10 metric tonnes per square meter
Heli Deck installed
Fire Fighting System of type FiFi 1 installed
1 Crane / Gear installed with a max lifting capacity of 150 tons
1 Crane / Gear installed with a max lifting capacity of 40 tons
Deadweight : 4,630 metric tonnes
Total 105 berths
Speed : 10 knots
Engines : 7 x Cummins / Cummins Engine Co Inc KTA-50-M, 10,444 kw, Propellers 1 Azimuth Elec. Dr. (Center) + 1 Azimuth Elec. Dr. (Port Side) + 1 Azimuth Elec. Dr. (Starboard)
Auxiliaries Engines : Bowthruster + No Sternthruster (2 Bow Tunnel thruster 843kw + 1 Bow Retract. dir. thruster 843kw)