2023-built 1,930 TEU Container ship
Built in October 2023 at Guangzhou Huangpu Wenchong Shipbuilding Co., Ltd., China
Deadweight: approx. 24,769 tonnes (at 10.01 m draft)
Class: NK
Next special survey: October 29, 2028
Next drydocking: October 29, 2026
Principal dimensions: Length overall 172.00 m, breadth 27.50 m, length between perpendiculars 168.72 m
Main engine: MAN-B&W 6S60ME-C10.5, power 10,380 kW
Tonnage: Gross tonnage 18,491 / Net tonnage 8,225
Container capacity: 1,930 TEU (including 1,366 slots for 14-ton heavy containers and 270 reefer plugs)
Ballast water treatment system: Installed
The price is usd42.3 million
Chinese Port