2026 Built 37,400 DWT 2,206 TEU Container Vessel
· Vessel Type: Container Ship
· Build Location: Taizhou, China
· Class:CCS(IACS)
· Build Status: Under construction (expected delivery in July 2026)
· Gross Tonnage: 23,875
· Length Overall (LOA): 184.80 m
· Beam (Width): 30.5 m
· Depth: 14.95 m
· Scantling Draft (Full Load Draft): 10.40 m
· Reference Deadweight: 37,400 tons
· Container Capacity: 2,206 TEU
– On deck (hatch covers): 1,264 TEU
– Under deck (holds): 942 TEU
· Reefer Container Capacity: 220 TEU
· Number of Holds: 6
· Hatch Cover Type: Lifting type (dock crane operation)
· Structural Type: Double bottom, double side
· Navigation Area: Unrestricted (worldwide), A1 + A2 + A3
· Main Engine: Guangchai Mitsubishi 6UEC42LSH-Eco-D3 / 7,560 kW / 118 rpm
· Generator Sets: 900 kW × 2 units, 300 kW × 2 units
Shaft Generator: 500 kW
· Speed: 14.5 knots
The EX Chinese port price is usd38.9 million
Chinese Port