2005 Built 297,400 DWT VLCC
Flag: Bahamas
Deadweight: 297,400 MT (at draft 21.5 m)
Built: April 2005, Dalian New Shipbuilding Heavy Industry Co., Ltd.
Class: ABS
Dry-docking due: April 2028; Special Survey due: April 2030
Gross Tonnage: 152,740 / Net Tonnage: 97,129
LOA: 330 m, Beam: 60 m, Depth: 29.7 m
Cargo tanks: 17; Cargo pumps: 3 × 5,500 m³/h
Cargo oil capacity: 324,600 m³
Main engine: MAN B&W 7S80MC, 34,643 BHP
Generators: 3 × 950 kW
Fitted with Inert Gas System (IGS), Crude Oil Washing system (COW) and Segregated Ballast Tanks (SBT)
Lightweight: 41,695.00 MT
Fully coiled cargo tanks throughout
Ballast Water Treatment System (BWTS) installed
The price is usd103 million