2006-built 73,428 DWT LNG Carrier
Year of build: April 2006
Place of build: South Korea
Class society: ABS
Length overall: 283m / Beam: 43.4m / Depth: 26m
Full-load draft: 12.4m
Reference deadweight: 73,428 MT
Cargo tanks: 4 tanks
Navigation area: Unrestricted navigation
Speed: 16.5 knots
Main engine: KAWASAKI H.I. STEAM TURBINE UA
Main engine power: 18,374 KW
The EX Chinese port price is usd80.5 million
Chinese Port